{"id":15945,"date":"2026-06-17T09:00:00","date_gmt":"2026-06-17T12:00:00","guid":{"rendered":"https:\/\/petrolgroup.pro\/en\/?p=15945"},"modified":"2026-05-20T01:06:10","modified_gmt":"2026-05-20T04:06:10","slug":"architectural-project-gas-station-process","status":"publish","type":"post","link":"https:\/\/petrolgroup.pro\/en\/architectural-project-gas-station-process\/","title":{"rendered":"Architectural project for a gas station: the complete process from site to operation"},"content":{"rendered":"\r\n<p class=\"wp-block-paragraph\">Building a gas station from scratch is one of the most regulated construction projects in Brazil and many other countries. An architectural project for a gas station is not just a set of drawings \u2014 it is the legal and technical foundation that determines whether your station gets licensed, financed, and built on time. The <a href=\"https:\/\/petrolgroup.pro\/en\/about\/\">Petrol Group<\/a> has developed gas station architectural projects in 16 countries.<\/p>\r\n\r\n\r\n\r\n<h2 class=\"wp-block-heading\">The 3 phases of a gas station architectural project<\/h2>\r\n\r\n\r\n\r\n<p class=\"wp-block-paragraph\"><strong>Preliminary project (anteprojeto)<\/strong>: defines the concept, site layout, and feasibility. This is what goes to the environmental licensing authority for pre-approval. <strong>Basic project<\/strong>: the level of detail required for building permits from the municipality. <strong>Executive project<\/strong>: the complete set of drawings used for construction \u2014 every dimension, every material specification, every connection detail resolved before the first excavation. Stations built with only a basic project have 3x more construction problems than stations built with a full executive project.<\/p>\r\n\r\n\r\n\r\n<h2 class=\"wp-block-heading\">What the project must cover<\/h2>\r\n\r\n\r\n\r\n<p class=\"wp-block-paragraph\">A complete gas station architectural project includes: site plan and forecourt layout, structural project (foundations, canopy structure), plumbing (water, sewage, oil\/water separator), electrical project with hazardous area classification (NR-20\/ABNT IEC 60079), fire protection project (PPCI), underground tank installation project, and accessibility compliance (NBR 9050). All coordinated by a single responsible architect or engineer.<\/p>\r\n\r\n\r\n\r\n<h2 class=\"wp-block-heading\">Environmental licensing and the architectural project<\/h2>\r\n\r\n\r\n\r\n<p class=\"wp-block-paragraph\">The environmental license requires the technical project as its primary input. A poorly prepared project means the environmental authority sends it back with deficiencies \u2014 adding 90-180 days to the licensing timeline. Petrol Group has a track record of first-submission approval in 14 Brazilian states.<\/p>\r\n\r\n\r\n\r\n<h2 class=\"wp-block-heading\">Frequently asked questions<\/h2>\r\n\r\n\r\n\r\n<p class=\"wp-block-paragraph\"><strong>Do I need a local architect or can I use one from another state?<\/strong><br \/>Brazilian law (CAU) allows architects licensed anywhere in Brazil to sign projects nationally, provided they register the ART\/RRT in the state where the work is. For licensing efficiency, the architect should know the specific state environmental authority&#8217;s requirements.<\/p>\r\n\r\n\r\n\r\n<p class=\"wp-block-paragraph\"><strong>How long does the full architectural project take?<\/strong><br \/>Single station executive project: 8-12 weeks. Network of 5 stations with common brand standards: 16-20 weeks.<\/p>\r\n\r\n\r\n<hr class=\"wp-block-separator\" \/>\r\n\r\n\r\n<p class=\"wp-block-paragraph\">Petrol Group has 25+ years designing gas stations across 16 countries. Explore our <a href=\"https:\/\/petrolgroup.pro\/en\/architecture\/\">service<\/a> or browse the <a href=\"https:\/\/petrolgroup.pro\/en\/portfolio\/\">portfolio<\/a>.<\/p>\r\n","protected":false},"excerpt":{"rendered":"<p>Complete guide to the architectural project for a gas station: the 3 phases, what must be covered, environmental licensing and how the project affects build time.<\/p>\n","protected":false},"author":2,"featured_media":16312,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[537,8],"tags":[],"class_list":["post-15945","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-todos","category-architecture"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v27.5 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Architectural project for a gas station: the complete process from site to operation | Petrol Group<\/title>\n<meta name=\"description\" content=\"Architectural project for a gas station: from site analysis and preliminary design through construction documents to commissioning. Petrol Group.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/petrolgroup.pro\/en\/architectural-project-gas-station-process\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Architectural project for a gas station: the complete process from site to operation\" \/>\n<meta property=\"og:description\" content=\"Architectural project for a gas station: from site analysis and preliminary design through construction documents to commissioning. Petrol Group.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/petrolgroup.pro\/en\/architectural-project-gas-station-process\/\" \/>\n<meta property=\"og:site_name\" content=\"Petrol Group\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/PetrolGROUP.pro\/\" \/>\n<meta property=\"article:published_time\" content=\"2026-06-17T12:00:00+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/petrolgroup.pro\/en\/wp-content\/uploads\/2026\/06\/Site-_-Capa-do-Blog-1920X1080-1.png\" \/>\n\t<meta property=\"og:image:width\" content=\"1920\" \/>\n\t<meta property=\"og:image:height\" content=\"1080\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/png\" \/>\n<meta name=\"author\" content=\"Petrolgroup.en\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:title\" content=\"Architectural project for a gas station: the complete process from site to operation\" \/>\n<meta name=\"twitter:description\" content=\"Architectural project for a gas station: from site analysis and preliminary design through construction documents to commissioning. Petrol Group.\" \/>\n<meta name=\"twitter:image\" content=\"https:\/\/petrolgroup.pro\/en\/wp-content\/uploads\/2026\/06\/Site-_-Capa-do-Blog-1920X1080-1.png\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"Petrolgroup.en\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"2 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/petrolgroup.pro\\\/en\\\/architectural-project-gas-station-process\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/petrolgroup.pro\\\/en\\\/architectural-project-gas-station-process\\\/\"},\"author\":{\"name\":\"Petrolgroup.en\",\"@id\":\"https:\\\/\\\/petrolgroup.pro\\\/en\\\/#\\\/schema\\\/person\\\/3a18f04c412c5044a6535e1c9e8f4f57\"},\"headline\":\"Architectural project for a gas station: the complete process from site to operation\",\"datePublished\":\"2026-06-17T12:00:00+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/petrolgroup.pro\\\/en\\\/architectural-project-gas-station-process\\\/\"},\"wordCount\":365,\"commentCount\":0,\"publisher\":{\"@id\":\"https:\\\/\\\/petrolgroup.pro\\\/en\\\/#organization\"},\"image\":{\"@id\":\"https:\\\/\\\/petrolgroup.pro\\\/en\\\/architectural-project-gas-station-process\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/petrolgroup.pro\\\/en\\\/wp-content\\\/uploads\\\/2026\\\/06\\\/Site-_-Capa-do-Blog-1920X1080-1.png\",\"articleSection\":[\"All\",\"Architecture\"],\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"CommentAction\",\"name\":\"Comment\",\"target\":[\"https:\\\/\\\/petrolgroup.pro\\\/en\\\/architectural-project-gas-station-process\\\/#respond\"]}]},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/petrolgroup.pro\\\/en\\\/architectural-project-gas-station-process\\\/\",\"url\":\"https:\\\/\\\/petrolgroup.pro\\\/en\\\/architectural-project-gas-station-process\\\/\",\"name\":\"Architectural project for a gas station: the complete process from site to operation | Petrol Group\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/petrolgroup.pro\\\/en\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/petrolgroup.pro\\\/en\\\/architectural-project-gas-station-process\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/petrolgroup.pro\\\/en\\\/architectural-project-gas-station-process\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/petrolgroup.pro\\\/en\\\/wp-content\\\/uploads\\\/2026\\\/06\\\/Site-_-Capa-do-Blog-1920X1080-1.png\",\"datePublished\":\"2026-06-17T12:00:00+00:00\",\"description\":\"Architectural project for a gas station: from site analysis and preliminary design through construction documents to commissioning. Petrol Group.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/petrolgroup.pro\\\/en\\\/architectural-project-gas-station-process\\\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/petrolgroup.pro\\\/en\\\/architectural-project-gas-station-process\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/petrolgroup.pro\\\/en\\\/architectural-project-gas-station-process\\\/#primaryimage\",\"url\":\"https:\\\/\\\/petrolgroup.pro\\\/en\\\/wp-content\\\/uploads\\\/2026\\\/06\\\/Site-_-Capa-do-Blog-1920X1080-1.png\",\"contentUrl\":\"https:\\\/\\\/petrolgroup.pro\\\/en\\\/wp-content\\\/uploads\\\/2026\\\/06\\\/Site-_-Capa-do-Blog-1920X1080-1.png\",\"width\":1920,\"height\":1080,\"caption\":\"Architectural project for a gas station\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/petrolgroup.pro\\\/en\\\/architectural-project-gas-station-process\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/petrolgroup.pro\\\/en\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"All\",\"item\":\"https:\\\/\\\/petrolgroup.pro\\\/en\\\/blog\\\/todos\\\/\"},{\"@type\":\"ListItem\",\"position\":3,\"name\":\"Architectural project for a gas station: the complete process from site to operation\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/petrolgroup.pro\\\/en\\\/#website\",\"url\":\"https:\\\/\\\/petrolgroup.pro\\\/en\\\/\",\"name\":\"Petrol Group\",\"description\":\"Architecture, Design and Visual Communication for Gas Stations\",\"publisher\":{\"@id\":\"https:\\\/\\\/petrolgroup.pro\\\/en\\\/#organization\"},\"alternateName\":\"Petrol\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/petrolgroup.pro\\\/en\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/petrolgroup.pro\\\/en\\\/#organization\",\"name\":\"Petrol Group\",\"alternateName\":\"Petrol\",\"url\":\"https:\\\/\\\/petrolgroup.pro\\\/en\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/petrolgroup.pro\\\/en\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/petrolgroup.pro\\\/en\\\/wp-content\\\/uploads\\\/2022\\\/09\\\/logo-petrolgroup.svg\",\"contentUrl\":\"https:\\\/\\\/petrolgroup.pro\\\/en\\\/wp-content\\\/uploads\\\/2022\\\/09\\\/logo-petrolgroup.svg\",\"width\":118,\"height\":18,\"caption\":\"Petrol Group\"},\"image\":{\"@id\":\"https:\\\/\\\/petrolgroup.pro\\\/en\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"sameAs\":[\"https:\\\/\\\/www.facebook.com\\\/PetrolGROUP.pro\\\/\"]},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/petrolgroup.pro\\\/en\\\/#\\\/schema\\\/person\\\/3a18f04c412c5044a6535e1c9e8f4f57\",\"name\":\"Petrolgroup.en\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/petrolgroup.pro\\\/en\\\/wp-content\\\/litespeed\\\/avatar\\\/174259fabbb5ab88c4b492071a45dcd7.jpg?ver=1781808397\",\"url\":\"https:\\\/\\\/petrolgroup.pro\\\/en\\\/wp-content\\\/litespeed\\\/avatar\\\/174259fabbb5ab88c4b492071a45dcd7.jpg?ver=1781808397\",\"contentUrl\":\"https:\\\/\\\/petrolgroup.pro\\\/en\\\/wp-content\\\/litespeed\\\/avatar\\\/174259fabbb5ab88c4b492071a45dcd7.jpg?ver=1781808397\",\"caption\":\"Petrolgroup.en\"},\"url\":\"https:\\\/\\\/petrolgroup.pro\\\/en\\\/author\\\/petrolgroup\\\/\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Architectural project for a gas station: the complete process from site to operation | Petrol Group","description":"Architectural project for a gas station: from site analysis and preliminary design through construction documents to commissioning. Petrol Group.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/petrolgroup.pro\/en\/architectural-project-gas-station-process\/","og_locale":"en_US","og_type":"article","og_title":"Architectural project for a gas station: the complete process from site to operation","og_description":"Architectural project for a gas station: from site analysis and preliminary design through construction documents to commissioning. Petrol Group.","og_url":"https:\/\/petrolgroup.pro\/en\/architectural-project-gas-station-process\/","og_site_name":"Petrol Group","article_publisher":"https:\/\/www.facebook.com\/PetrolGROUP.pro\/","article_published_time":"2026-06-17T12:00:00+00:00","og_image":[{"width":1920,"height":1080,"url":"https:\/\/petrolgroup.pro\/en\/wp-content\/uploads\/2026\/06\/Site-_-Capa-do-Blog-1920X1080-1.png","type":"image\/png"}],"author":"Petrolgroup.en","twitter_card":"summary_large_image","twitter_title":"Architectural project for a gas station: the complete process from site to operation","twitter_description":"Architectural project for a gas station: from site analysis and preliminary design through construction documents to commissioning. Petrol Group.","twitter_image":"https:\/\/petrolgroup.pro\/en\/wp-content\/uploads\/2026\/06\/Site-_-Capa-do-Blog-1920X1080-1.png","twitter_misc":{"Written by":"Petrolgroup.en","Est. reading time":"2 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/petrolgroup.pro\/en\/architectural-project-gas-station-process\/#article","isPartOf":{"@id":"https:\/\/petrolgroup.pro\/en\/architectural-project-gas-station-process\/"},"author":{"name":"Petrolgroup.en","@id":"https:\/\/petrolgroup.pro\/en\/#\/schema\/person\/3a18f04c412c5044a6535e1c9e8f4f57"},"headline":"Architectural project for a gas station: the complete process from site to operation","datePublished":"2026-06-17T12:00:00+00:00","mainEntityOfPage":{"@id":"https:\/\/petrolgroup.pro\/en\/architectural-project-gas-station-process\/"},"wordCount":365,"commentCount":0,"publisher":{"@id":"https:\/\/petrolgroup.pro\/en\/#organization"},"image":{"@id":"https:\/\/petrolgroup.pro\/en\/architectural-project-gas-station-process\/#primaryimage"},"thumbnailUrl":"https:\/\/petrolgroup.pro\/en\/wp-content\/uploads\/2026\/06\/Site-_-Capa-do-Blog-1920X1080-1.png","articleSection":["All","Architecture"],"inLanguage":"en-US","potentialAction":[{"@type":"CommentAction","name":"Comment","target":["https:\/\/petrolgroup.pro\/en\/architectural-project-gas-station-process\/#respond"]}]},{"@type":"WebPage","@id":"https:\/\/petrolgroup.pro\/en\/architectural-project-gas-station-process\/","url":"https:\/\/petrolgroup.pro\/en\/architectural-project-gas-station-process\/","name":"Architectural project for a gas station: the complete process from site to operation | Petrol Group","isPartOf":{"@id":"https:\/\/petrolgroup.pro\/en\/#website"},"primaryImageOfPage":{"@id":"https:\/\/petrolgroup.pro\/en\/architectural-project-gas-station-process\/#primaryimage"},"image":{"@id":"https:\/\/petrolgroup.pro\/en\/architectural-project-gas-station-process\/#primaryimage"},"thumbnailUrl":"https:\/\/petrolgroup.pro\/en\/wp-content\/uploads\/2026\/06\/Site-_-Capa-do-Blog-1920X1080-1.png","datePublished":"2026-06-17T12:00:00+00:00","description":"Architectural project for a gas station: from site analysis and preliminary design through construction documents to commissioning. Petrol Group.","breadcrumb":{"@id":"https:\/\/petrolgroup.pro\/en\/architectural-project-gas-station-process\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/petrolgroup.pro\/en\/architectural-project-gas-station-process\/"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/petrolgroup.pro\/en\/architectural-project-gas-station-process\/#primaryimage","url":"https:\/\/petrolgroup.pro\/en\/wp-content\/uploads\/2026\/06\/Site-_-Capa-do-Blog-1920X1080-1.png","contentUrl":"https:\/\/petrolgroup.pro\/en\/wp-content\/uploads\/2026\/06\/Site-_-Capa-do-Blog-1920X1080-1.png","width":1920,"height":1080,"caption":"Architectural project for a gas station"},{"@type":"BreadcrumbList","@id":"https:\/\/petrolgroup.pro\/en\/architectural-project-gas-station-process\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/petrolgroup.pro\/en\/"},{"@type":"ListItem","position":2,"name":"All","item":"https:\/\/petrolgroup.pro\/en\/blog\/todos\/"},{"@type":"ListItem","position":3,"name":"Architectural project for a gas station: the complete process from site to operation"}]},{"@type":"WebSite","@id":"https:\/\/petrolgroup.pro\/en\/#website","url":"https:\/\/petrolgroup.pro\/en\/","name":"Petrol Group","description":"Architecture, Design and Visual Communication for Gas Stations","publisher":{"@id":"https:\/\/petrolgroup.pro\/en\/#organization"},"alternateName":"Petrol","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/petrolgroup.pro\/en\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/petrolgroup.pro\/en\/#organization","name":"Petrol Group","alternateName":"Petrol","url":"https:\/\/petrolgroup.pro\/en\/","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/petrolgroup.pro\/en\/#\/schema\/logo\/image\/","url":"https:\/\/petrolgroup.pro\/en\/wp-content\/uploads\/2022\/09\/logo-petrolgroup.svg","contentUrl":"https:\/\/petrolgroup.pro\/en\/wp-content\/uploads\/2022\/09\/logo-petrolgroup.svg","width":118,"height":18,"caption":"Petrol Group"},"image":{"@id":"https:\/\/petrolgroup.pro\/en\/#\/schema\/logo\/image\/"},"sameAs":["https:\/\/www.facebook.com\/PetrolGROUP.pro\/"]},{"@type":"Person","@id":"https:\/\/petrolgroup.pro\/en\/#\/schema\/person\/3a18f04c412c5044a6535e1c9e8f4f57","name":"Petrolgroup.en","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/petrolgroup.pro\/en\/wp-content\/litespeed\/avatar\/174259fabbb5ab88c4b492071a45dcd7.jpg?ver=1781808397","url":"https:\/\/petrolgroup.pro\/en\/wp-content\/litespeed\/avatar\/174259fabbb5ab88c4b492071a45dcd7.jpg?ver=1781808397","contentUrl":"https:\/\/petrolgroup.pro\/en\/wp-content\/litespeed\/avatar\/174259fabbb5ab88c4b492071a45dcd7.jpg?ver=1781808397","caption":"Petrolgroup.en"},"url":"https:\/\/petrolgroup.pro\/en\/author\/petrolgroup\/"}]}},"_links":{"self":[{"href":"https:\/\/petrolgroup.pro\/en\/wp-json\/wp\/v2\/posts\/15945","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/petrolgroup.pro\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/petrolgroup.pro\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/petrolgroup.pro\/en\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/petrolgroup.pro\/en\/wp-json\/wp\/v2\/comments?post=15945"}],"version-history":[{"count":2,"href":"https:\/\/petrolgroup.pro\/en\/wp-json\/wp\/v2\/posts\/15945\/revisions"}],"predecessor-version":[{"id":16313,"href":"https:\/\/petrolgroup.pro\/en\/wp-json\/wp\/v2\/posts\/15945\/revisions\/16313"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/petrolgroup.pro\/en\/wp-json\/wp\/v2\/media\/16312"}],"wp:attachment":[{"href":"https:\/\/petrolgroup.pro\/en\/wp-json\/wp\/v2\/media?parent=15945"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/petrolgroup.pro\/en\/wp-json\/wp\/v2\/categories?post=15945"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/petrolgroup.pro\/en\/wp-json\/wp\/v2\/tags?post=15945"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}