Home » Architecture » Gas station codes and standards: the main U.S. rules to know

Gas station codes and standards: the main U.S. rules to know

The main codes and rules for gas stations in the United States: NFPA 30A, NFPA 30, the IFC, the NEC, EPA tank and vapor rules, OSHA and the ADA, and what each requires in practice.
Normas ABNT gas station

A gas station is one of the most regulated commercial projects in the United States — with federal rules from the EPA, OSHA and the ADA, model fire, building and electrical codes that each state and city adopts and amends, and state programs for tanks and for weights and measures. Petrol Group listed the codes and rules that most affect the day-to-day of the design and operation.

The 10 most relevant codes and rules for U.S. gas stations

  • NFPA 30A: Code for Motor Fuel Dispensing Facilities and Repair Garages — dispensing, dispensers, classified areas and repair garages. NFPA lists the 2024 edition as current.
  • NFPA 30: Flammable and Combustible Liquids Code — storage tanks and piping for flammable and combustible liquids.
  • International Fire Code (IFC), Chapter 23: Motor Fuel-Dispensing Facilities and Repair Garages — location of dispensers, emergency fuel shutoff and attended or unattended self-service.
  • NFPA 70 (National Electrical Code), Article 514: Motor Fuel Dispensing Facilities — wiring and equipment in the classified areas of the forecourt.
  • EPA 40 CFR Part 280: underground storage tank (UST) systems — design, installation, release detection, operator training and financial responsibility.
  • EPA 40 CFR Part 63, Subpart CCCCCC: gasoline vapor control at dispensing facilities — submerged fill from 10,000 gallons of gasoline per month and a vapor balance system from 100,000 gallons per month.
  • OSHA 29 CFR 1910.106: flammable liquids, with a section on service stations — classified areas, emergency switches and no open flames in fueling areas.
  • 2010 ADA Standards for Accessible Design: accessibility of parking, routes, restrooms, the store and the dispensers. The Justice Department also says stations must provide refueling assistance on request, with limited exceptions (ADA business brief for gas stations).
  • NFPA 54 and NFPA 52: the National Fuel Gas Code for gas piping in buildings (for example, a store kitchen) and the Vehicular Natural Gas Fuel Systems Code, if the station sells CNG.
  • NIST Handbook 44: specifications and tolerances for weighing and measuring devices, including liquid-measuring devices; all 50 states adopt it, in its current or an older edition, for the weights and measures inspection of dispensers (NIST).

Plumbing (restrooms, oil-water separators), drainage and lighting follow the plumbing, energy and stormwater rules your state and city adopt, and there is no single national standard for them: check with your authority having jurisdiction (AHJ). If construction disturbs 1 acre or more, the site also needs stormwater permit coverage under the Clean Water Act (EPA).

40 CFR Part 280: the most critical rule for new projects

The EPA tank rules govern the underground storage tanks — the heart of the station. In short, they require:

  • secondarily contained tanks and piping with interstitial monitoring for anything installed or replaced after April 11, 2016, and under-dispenser containment for new dispenser systems (40 CFR 280.20; EPA summary);
  • tanks and piping built to a recognized code of practice (the rule lists, for example, UL 58 and UL 1316) and installed under one such as PEI RP100, API 1615 or NFPA 30 and 30A;
  • spill and overfill prevention: automatic shutoff when the tank is no more than 95 percent full, or an alert at no more than 90 percent;
  • notice to the state or local implementing agency within 30 days of bringing the system into use (280.22);
  • testing of spill buckets and containment sumps and inspection of overfill equipment at least every three years (280.35), plus walkthrough inspections every 30 days (280.36).

Your state runs its own UST program: the EPA says state programs must be at least as stringent as the federal rules and are often more stringent (state UST programs). Before operation, the system must also pass the tests your state requires — see tank tightness testing.

What Petrol Group handles in the design

  • Site layout with dispensers, islands, tanks, fill points and vents placed by the distances of the codes your AHJ enforces.
  • Classified areas, accessible routes and parking shown from the first layout.
  • Brand identity, signage design, store design, 3D renderings and design specifications.
  • Coordination with the engineers who prepare the tank, electrical and civil drawings.

Petrol Group works remotely. A locally licensed architect or engineer of record signs the project and files it with the AHJ. More on how we work with U.S. owners: gas station design in the USA.

FAQ

Where can I read these codes?
NFPA offers free read-only access to its codes after you sign in (NFPA free access), and ICC publishes read-only versions of the I-Codes on its Digital Codes site (ICC). EPA and OSHA rules are free on the eCFR, and the ADA Standards are on ADA.gov. For the design, the architecture and engineering team must work with the editions your jurisdiction adopted. See how Petrol Group runs a gas station architecture project.

Which edition applies to my project?
The one your state and city adopted, with their amendments, at the time of the permit — not necessarily the latest one. Ask the building department and the fire marshal before the design starts.

Who signs the drawings?
An architect or engineer licensed in the state where the station will be built. State law decides which drawings need a seal.


See also: environmental permits for gas stations and gas station regulatory compliance.