Home » All » Gas station floor plan: what it must show, how to read it and why it is required for permitting

Gas station floor plan: what it must show, how to read it and why it is required for permitting

What a gas station floor plan must contain: fueling islands, underground tanks, convenience store, drainage system, setbacks and why this document is required for ANP and environmental licensing.

The gas station floor plan is the foundational document for permitting — required by the municipality, the environmental agency, and the ANP. It is the bird’s-eye view that defines whether a proposed site is technically feasible before any ground is broken. The Petrol Group team has produced hundreds of gas station floor plans across 16 countries.

What the floor plan must show

Fueling island positioning (with pump dimensions and minimum clearances), underground tank locations (with depth, capacity, and bicameral specification), vehicle circulation lanes (minimum turning radius for trucks at highway sites), convenience store and restroom building, forecourt drainage system (channels, catchment points, oil/water separator location), minimum setbacks from property boundaries, and pylon/totem position.

Minimum setback requirements

ABNT NBR 15526 and ANP resolutions define: tank fill points — minimum 4m from any building, minimum 1m from property boundary; dispensers — minimum 3m from property line, minimum 4m from buildings. All setbacks must be dimensioned clearly on the floor plan.

FAQ

Does the floor plan require an engineer’s stamp?
Yes — must be signed by a licensed engineer or architect with ART (CREA) or RRT (CAU) registration.


See: executive project guide and architectural project services.

Stay updated on the best content about the gas station industry